Behind the Scenes. 2G Energy Virtual Factory Tour.

Sign Up below

With more than 7,500 CHP systems installed world-wide, see where they are manufactured.

Walk the campus, virtually, with Andre, International Sales Manager, while he explains the inner workings of 2G, on April 15th, 2021. He will walk you through the 2G Energy Campus in Heek, Germany.

The tour will be live and any questions you have will be answered.

  • Find out what the latest digital tools 2G offers are
  • The world's first 100% hydrogen CHP system discussed
  • Have a look at the broad CHP portfolio between 50 kW and 2 MW for a huge variety of applications
  • Walk virtually inside a containerized solution
  • Visit the test benches and see how much efforts 2G puts an high-quality long-lasting solutions

2G_Container_agenitor_408

Plug and Play 

Containerized for easy installation

 

My_2G_graphic copy

Control in Your Hands

Digital tools to make operations easy

 

Hydrogen_engine

Cutting Edge

World's first 100% hydrogen CHP system